• Calculation and design of sewers and structures for a realistic project:
- Numerical and computer-aided calculation methods for sewer and pollution load calculation.
- Design of individual structures, e.g. sewers, stormwater infiltration systems, spillways, stormwater retention areas, special structures.
• Preparation of a project report:
- EDP-supported processing
- Cost calculations
- Variant comparisons
- Explanatory report
- Presentation
• Soft skills in the context of project work:
- Ability to work in a team: project as group work
- Presentation techniques
- Preparation of the design documents
• Presentation and defence of the design