- Cost optimized formwork planning with Doka Tipos® (Floor plan import and dimensioning, wall formwork with cycles, slab formwork, calculation of lease rental charges)
- Resource-optimised scheduling with ACOS PLUS 1® (network plan, Gantt chart, resource-optimisation)
- Scheduling with Asta PowerProject® (Gantt chart, modelling of disruptions in the construction process)
- Scheduling with TILOS® (distance-time diagram)