Technology for carrying out earthwork stabilization using elements with shallow/direct foundations.
Earthwork stabilization using indirectly founded elements: micropiles and large-diameter piles.
Technology for stabilizing earthworks with reinforced soil.
Technology for constructing surface rainwater collection and drainage systems.
Technology for collecting and draining infiltration water.
Technologies for constructing prefabricated culverts.
Lab hours:
Calculation of earthwork volumes for the construction of 1.5 km of road (2 sessions).
Description of the execution technology and determination of quantities for 50 linear meters of a gravity retaining wall made of concrete (2 sessions).
Calculation of material quantities, type of equipment and number of machines required, and description of the execution technology for a DD5 prefabricated culvert, L = 5.0 m (2 sessions).
Submission and presentation/defense of projects (1 session)
ECTS credits
3
Teaching Language
Română
Exam Language
Română
Support Materials Language
Română
Basic Learning Outcomes
Final Learning Outcomes
Ability to apply the procedures of CONSTRUCTION PRACTICE
(F7 - CEB - Ability to apply the procedures of CONSTRUCTION PRACTICE )